Kitchen floor change in Cullera
Before renewing the visible fabric with preserved base furniture, check what access exists under them and where the current flooring ends. A plinth can hide a jagged edge or a change in material. This information allows us to define how far the work goes and how the line behind the installed front will be resolved.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
What we check before laying the pavement
- Existing baseCondition of the support and adherence of the current pavement.
- WithdrawalRaised from the ground if the project requires it.
- LevellingPreparation of the surface for the new finish.
- HeightsCompatibility with doors, plinths and appliances.
- PlacementInstallation of the flooring chosen according to its conditions.
- JointsTrims on skirting boards, thresholds and furniture.
Kitchen floor replacement quote in Cullera
Check the space to remove appliances
The final thickness affects the spaces in the washing machine or dishwasher under the counter. Coordinate the choice with the placement and removal of appliances, including those that will be reused. It is necessary to check the available height to avoid leaving equipment trapped after raising the visible floor in front of it and maintaining its base without intervening. See also: placing and removing appliances.
Specify surface area and conserved areas
In the floor breakdown, it is asked to distinguish preparation, material and finishes, identifying the strips that will not be touched. The conservation of furniture also needs protection and an order of execution compatible with its use. Comparing proposals with different limits can hide important differences even if both describe the same nominal surface area or a similar finish. See also: soil breakdown.
Quote and scope of work at Cullera
Keeping furniture limits access to the pavement and changes edge work. We describe which areas are intervened, which plinths are removed and how the encounter is completed, in addition to the preparation and supply of the new floor.






